Contact US

lf you have any queries, get in touch today! Don't hesitate, We try to take the extra step forour customer satisfaction.

 

Contact Us

  • First Name *

  • Last Name *

  • Email *

  • Message

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Dongguan Xingcheng Machinery Equipment Co., Ltd. welcomes you!      【+86-158-1765-4546  Miss Zhu】 【+86-138-2884-5503  Mr.Chen】     380052178@qq.com        

图片展示
English
  • English
  • 한국어
  • Français
  • shqiptare
  • عربي
  • አማርኛ
  • আচাম
  • AzerbayjanlıName
  • Eʋegbe
  • Aymara
  • Íris
  • Eesti keel
  • ଓଡିଆ
  • adeta
  • BaskoaName
  • БеларускаяName
  • Bamanankan
  • Български
  • ÍslandName
  • Polski
  • Bosanski
  • فارسی
  • इहो देखल जाय
  • Booleaanse (Afrikaans)
  • Татар
  • Dansk
  • Deutsch
  • Пермь
  • ትግንያውያን
  • डोग्रिड ने दी
  • Русский язык
  • Sanskrit
  • Pilipino
  • suomi
  • Frysk
  • ខ្មែរKCharselect unicode block name
  • ჯორჯიანიName
  • गोंगेन हें नांव
  • ગુજરાતી
  • pem
  • қазақ
  • Kreyòl ayisyen
  • dictionary variant
  • Nederlands
  • Кыргыз тили
  • Galiciano
  • Catalan
  • Čeština
  • ಕನ್ನಡ್Name
  • Histocre
  • a n:n
  • Hrvatska
  • Quechua
  • Zimanê Kurdî
  • Zimanê Kurdî
  • Latina
  • Latvijas
  • ກະຣຸນາ
  • Lietuva
  • Lingala
  • Luganda
  • LëtzebuergeschName
  • Ruwanda
  • română
  • Malagasy
  • Malti

News

Injection molding machine industry trends

Yizumi Electric Injection Molding Machine Operating Instructions

Time: 2025-04-28 13:33:53

Author: Dongguan Xingcheng Machinery Equipment Co., Ltd

Click:

### **1. Safety Protocols**  1. **Personal Protective Equipment (PPE)**     - We

### **1. Safety Protocols**  

1. **Personal Protective Equipment (PPE)**  

   - Wear safety helmets, protective goggles, anti-slip shoes, and gloves.  

   - Avoid loose clothing or accessories.  

2. **Pre-Operation Checks**  

   - Ensure emergency stop buttons are disengaged and the power supply is properly grounded.  

   - Verify hydraulic oil and lubricant levels, and check for leaks in pipelines.  

3. **Hazard Zones**  

   - Never place hands near the mold clamping area or moving injection unit during operation.  

---

### **2. Startup & Initialization**  

1. **Power-Up Sequence**  

   - Turn on the main power supply and activate the Human-Machine Interface (HMI).  

   - Perform a **'Homing'** operation to reset all axes (injection unit, ejector pins, mold).  

2. **Parameter Setup**  

   - Input or load preset parameters (injection pressure, speed, holding time, cooling time, etc.).  

   - Adjust melt temperature based on material type (e.g., ABS: 200–260°C, PC: 280–320°C).  

---

### **3. Mold Installation & Debugging**  

1. **Mold Mounting**  

   - Secure the mold using lifting equipment, ensuring alignment via mold locating rings.  

   - Set clamping force according to the mold’s design specifications (avoid overloading).  

2. **Test Run**  

   - Perform 3–5 empty mold-opening/closing cycles to check for abnormalities.  

   - Conduct a **short-shot test** to verify injection consistency before full production.  

---

### **4. Production Operation**  

1. **Auto Mode**  

   - Confirm all parameters, then switch to automatic mode.  

   - Monitor real-time data (pressure, temperature, cycle time) on the HMI.  

2. **Quality Control**  

   - Regularly sample and inspect products for defects (e.g., sink marks, flash).  

   - Adjust parameters incrementally if deviations occur.  

---

### **5. Shutdown & Maintenance**  

1. **Safe Shutdown**  

   - Switch to manual mode, retract the injection unit, and open the mold fully.  

   - Turn off the heater and allow the machine to cool before cutting the main power.  

2. **Routine Maintenance**  

   - Clean the mold and barrel after each use to prevent material residue.  

   - Lubricate moving parts weekly and replace hydraulic oil annually.  

---

### **Key Warnings**  

- **Never bypass safety sensors or interlocks.**  

- **Immediately press the emergency stop** if abnormal noise, smoke, or vibrations occur.  

- Only trained personnel should service high-voltage components.  

For detailed troubleshooting or advanced settings, consult Yizumi’s technical support or regional service centers.  

*(Note: Specifications may vary by model. Always prioritize guidelines in the official manual.)*


Yizumi Electric Injection Molding Machine Operating Instructions
### **1. Safety Protocols**  1. **Personal Protective Equipment (PPE)**     - We
Long by picture save/share
0

Welcome to leave a message for consultation. We will contact you as soon as we receive the information!

  • First Name *

  • Last Name *

  • Email *

  • Message

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

    Welcome to leave a message for consultation. We will contact you as soon as we receive the information!

    • First Name *

    • Last Name *

    • Email *

    • Message

  • 提交

  • Security Code
    Refresh the code
    Cancel
    Confirm

    WeChat

    Product technical consultation

    Xingcheng Machinery Equipment Co., Ltd., Dongguan City, Guangdong Province, China

     

    Address:No. 5 Daxing Road, Nanfang Village, Xiegang Town, Dongguan City, Guangdong Province, China
    Contact:+86-138-2884-5503 Mr. Chen        +86-158-1765-4546 Miss Zhu
    Phone: +86-0769-8200-2081                           Email: 380052178@qq.com 
       
                       

     

    WeChat

    Product technical consultation

    Copyright © 2005-2025 Xingcheng Machinery Equipment Co., Ltd., Dongguan City, Guangdong Province, China     网站地图

    添加微信好友,详细了解产品
    使用企业微信
    “扫一扫”加入群聊
    复制成功
    添加微信好友,详细了解产品
    我知道了