Installation

- Site preparation: Choose a flat, dry, and well - ventilated site. The floor should be able to bear the weight of the machine. Make sure there is enough space around the machine for operation and maintenance.
- Machine unloading and positioning: Use appropriate lifting equipment to unload the machine from the transportation vehicle and place it in the designated position. Align the machine with the foundation bolts and adjust the level of the machine using a spirit level.
- Piping and wiring: Connect the hydraulic pipes, cooling water pipes, and electrical wires according to the machine's installation manual. Ensure that the connections are tight and leak - free. Check the electrical wiring to ensure that it meets the safety requirements.
- Installation of peripheral equipment: Install peripheral equipment such as the mold, hopper, and dryer. Connect them to the main machine properly to ensure the normal
English
shqiptare
عربي
አማርኛ
আচাম
AzerbayjanlıName
Eʋegbe
Aymara
Íris
Eesti keel
adeta
BaskoaName
БеларускаяName
Bamanankan
Български
ÍslandName
Polski
Bosanski
فارسی
इहो देखल जाय
Booleaanse (Afrikaans)
Татар
Dansk
Deutsch
Пермь
ትግንያውያን
डोग्रिड ने दी
Русский язык
Français
Sanskrit
Pilipino
suomi
Frysk
ខ្មែរKCharselect unicode block name
ჯორჯიანიName
गोंगेन हें नांव
ગુજરાતી
pem
қазақ
Kreyòl ayisyen
한국어
dictionary variant
Nederlands
Кыргыз тили
Galiciano
Catalan
Čeština
ಕನ್ನಡ್Name
Histocre
a n:n
Hrvatska
Quechua
Zimanê Kurdî
Zimanê Kurdî
Latina
Latvijas
ກະຣຸນາ
Lingala
Luganda
LëtzebuergeschName
Ruwanda
română
Malagasy
Malti
【+86-158-1765-4546 Miss Zhu】 【+86-138-2884-5503 Mr.Chen】
380052178@qq.com 